Télécharger Imprimer la page

Camoplast UTV T4S Directives D'installation page 12

John deere
Masquer les pouces Voir aussi pour UTV T4S:

Publicité

9. Attach the stabilizing rod (B) to the anchor
bracket (A), using the long spacer bushing (C),
the short spacer bushing (D), flat washer (E) and
nut (F). Torque to 70 N•m [52 lb•ft]. Refer to
Figure 13.
NOTE: Ensure that parts are assembled in the
correct order.
NOTE: For model years 2007 to 2010, the
stabilizing rod must be installed on the
inside of the anchor bracket, toward the
center of the vehicle.
For 2011 and later model years, the
stabilizing rod must be installed on the
outside of the anchor bracket.
Figure 13
2007-2010
10. Inspect the rear track systems and ensure that
all mounting bolts were correctly tightened
during installation. Lower the vehicle to the
ground and proceed to install the front track
systems.
Installation Guidelines / Directives d'installation
9. Fixer le bras stabilisateur (B) au boulon déjà
installé sur l'ancrage de suspension (A) à l'aide
de l'espaceur long (C), l'espaceur court (D), de
la rondelle (E) et de l'écrou autobloquant (F).
Serrer à un couple de 70 N•m [52 lb•pi]. Voir la
Figure 13.
NOTE : Assurez-vous d'assembler les pièces dans
l'ordre indiqué.
NOTE : Pour les années-modèle 2007 à 2010, le
bras stabilisateur doit être installé à
l'intérieur de l'ancrage antirotation, vers le
centre du véhicule.
Pour les années-modèle 2011 et plus, le
bras stabilisateur doit être installé à
l'extérieur de l'ancrage antirotation.
2011 +
10. Inspecter les systèmes de traction arrière et
s'assurer que tous les boulons ont été serrés
correctement lors de l'installation. Abaisser
ensuite le véhicule au sol et procéder à
l'installation des systèmes de traction avant.
Page 12
©2016 Camso inc.

Publicité

loading