Electrical Installation - DURAVIT 2nd floor 7X0079 Notice De Montage

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 8

Electrical installation

Power supply
Fuse protection
RCD
Pre-installation
> Installing a permanent power supply line
(2 supply lines are required for the Combi/Jet L with a
temperature module):
• Pre-connect a separate fuse and residual current
operating device (RCD)
• Pre-connect an all-pole separating main switch
outside the prescribed safety areas (0 - 2)
• Allow the supply line to protrude by 3,000 mm
> Laying the potential equalisation cable:
• Allow the cable to protrude by 3,000 mm
16
Connecting the whirltub (Diagram 16)
NoTE! Avoiding any malfunctions!
• Do not fasten the cables together with cable ties.
• Do not install the supply line parallel to the control
cables.
I
Connect the supply line to the mains supply
socket.
II
Connect the potential equalisation cable to the
whirltub.
74-/76xxxx xx x xx xx00: 50 Hz, 220 - 240 V AC
74-/76xxxx xx x xx xx06: 60 Hz, 220 - 240 V AC
71xxxx xx x xx xx00:
50 Hz, 220 - 230 V AC
71xxxx xx x xx xx06:
60 Hz, 220 - 230 V AC
IN = 16 A
I
≤ 30 mA
ΔN
Safety areas in accordance with DIN VDE 0100-701
0
6 0
1
0
I
L
N
PE
II
6 0
0
2
3
* or the height of
the highest shower
head / water outlet
that is permanently
installed; depending
on which is higher
WH_M_Einbau_MV-AV_EasyClick/13.10.4
7

Publicité

Table des Matières
loading

Table des Matières