2/ Packing List; 3/ Installation - cec Line C'EI X Mode D'emploi

Electrolyseur de sel
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

2/ PACKING LIST

1 controller
and its mounting kit
1 cell power cable

3/ INSTALLATION

Before proceeding with installation of the device, it is very important to check the following points:
Ensure that all of the hydraulic equipment is in good working order and is correctly sized. In
particular, check the delivery of the filtration pump, the capacity of the filter and the diameter of the
tubings.
The maximum pressure of the water in the cell must not exceed 3 bars.
The device's treatment capacity should be appropriate for the volume of water to be treated and
for the climate of the location in which it is installed. A device which is designed to treat a volume of 90
m3 in a temperate climate should be limited to a 70 m3 family pool in a hot climate or when using well
water.
The installation area should be dry and properly ventilated, protected from rain, splashes, water
spray and UV radiation. Ensure that the pH corrector product container is kept in a place sufficiently
remote from any electrical equipment and any other chemical product.
Failure to comply with this instruction will lead to abnormal oxidation of the metallic parts which could
result in a complete breakdown of the device
Assembly of the devices must be performed strictly in compliance with the following layout diagram:
1 chlorinator cell
and four 63/50 reducers
1 salt/temperature
sensor
20
1 salt and water
hardness analysis kit
1 accessory holder
and 2 plugs
1 pool cover cable

Publicité

Table des Matières
loading

Table des Matières