dirna Bergstrom bycool green line COMPACT 3.0 RENAULT Instructions De Montage page 26

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

COMPACT 3.0
EN
+
-
1- Connect the upper power supply cable to the back of equipment and lead it through the back of the cab
whilst sticking down the plastic clips and securing it with flanges.
2- Connect the lower power supply cable to the Box of fuses + and in the center of masses- , As it is
indicated, by leading it through the original cable route, secured with flanges, to the back of the cab, to
connect it with the upper power supply cable.
WHEN CONNECTING THE CABLES LEAVE A SUFFICIENT DISTANCE TO PREVENT THEM BREAKING
DUE TO MOVEMENTS OF THE CAB!
IMPORTANT: Due to the equipment's complex electronic regulation system, the socket must be made
directly on the vehicle's battery.
IMPORTANT: For start up please see the User's Manual.
3
Detailed instructions
on power wiring assembly
2
3
2
wiring for power
supply
3- Place danger stickers on the cable join and on
the cab elevation device.
26
Air conditioning for vehicles
1

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Bycool green line compact 3.0

Table des Matières