Packaging; Starting, Operation - WIKA A-10 Mode D'emploi

Masquer les pouces Voir aussi pour A-10:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

6. Packaging / 7. Starting, operation

6. Packaging

Has everything been supplied?
Check the scope of supply:
Completely assembled pressure transmitters
Ordered accessories
Inspect the pressure transmitter for possible damage during transportation. Should
there be any obvious damage, inform the transport company and GREISINGER
without delay.
Keep the packaging, as it offers optimal protection during transportation (e.g. chan-
ging installation location, shipment for repair).
Ensure that the pressure connection thread and the connection contacts will not be
damaged.

7. Starting, operation

Required tools: wrench (flats 27), screw driver
Diaphragm test for your safety
It is necessary that before starting the pressure transmitter you test the instrument visual, as
the diaphragm is a safety-relevant component.
Pay attention to any liquid leaking out, for this points to a diaphragm
!
damage.
Use the pressure transmitter only if the diaphragm is undamaged.
Warning
Use the pressure transmitter only if it is in a faultless condition as far as the
safety-relevant features are concerned.
6
Operating instructions/Betriebsanleitung/Mode d'emploi/Instrucciones de servicio
GB
A-10

Publicité

Table des Matières
loading

Table des Matières