Publicité

3.
Mark the Wall Jambs
Pencil
Crayon à papier
Lápiz
Level
Wall Jamb
Niveau à bulle
Montant du mur
Nivel
Jamba mural
Round off bottom ends of wall jambs if necessary.
Arrondir les extrémités inférieures des montants du mur si nécessaire.
Redondee los extremos inferiores de las jambas murales, si es necesario.
Position a wall jamb against the wall directly over the bottom track with the
shorter leg facing out. The wall jamb should sit flat against the wall.
Slide the wall jamb down over the bottom track until the wall jamb and bottom
track are fully engaged.
IMPORTANT! The wall jamb must sit flat on the bottom ledge. If your ledge has a
curve in the corners at the side wall, it may be necessary to shape the bottom end of
the wall jamb with a file.
Use a level to plumb the wall jamb vertically.
Using the pre-drilled screw holes as a guide, mark the hole locations on the wall.
Repeat the procedures with the second wall jamb.
Remove the bottom track and wall jambs.
NOTE: When installing on ceramic tile, use a center punch to nick the surface of the
glaze. Tap the center punch lightly with a hammer to avoid cracking the tile.
Lightly center punch the hole locations.
Drill a 3/16" hole at each mark. Use a tile or masonry bit for ceramic tile.
Thoroughly clean the shower floor ledge and wall.
Insert plastic anchors in each hole.
Sterling
Anchor
Wall Jamb
Ancrage
Montant du mur
Anclaje
Jamba mural
Wall Jamb
Montant du mur
Jamba mural
9
Bottom Track (Inside)
Rail inférieur (Intérieur)
Carril inferior (interior)
Bottom Track
Rail inférieur
Carril inferior
1063218-2-B