Installing The Pipette Calibration Kit; Operation; Filling The Moisture Trap - Sartorius YCP06SQ Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 15
4.3 Installing the Pipette
Calibration Kit
5
4
Procedure
Insert the following components into
t
the weighing chamber in the order
given:
3
− Weighing chamber base of pipette
calibration kit (1)
− Moisture trap (2)
− Pipetting vessel (3)
− Lid of pipetting vessel (4)
2
− Glass lid of moisture trap (5)
5

Operation

1

5.1 Filling the Moisture Trap

Notice
Equipment damage due to improper
filling!
Fill the moisture trap outside of the
t
balance.
Procedure
Fill the moisture trap with water at
t
maximum up to the inner edge.
NOTICE To prevent damage due to
t
corrosion inside the weighing chamber,
be sure to empty the moisture trap
when not in use. Leave the moisture
trap filled with water only for the time
it takes to prepare for and perform
pipette calibration.
YCP06SQ Operating Instructions
Operation
7

Publicité

Table des Matières
loading

Table des Matières