Supplies Required:
• (3) ³⁄₈" floor anchors and bolts
• Pipe sealant
• Piping to 1¼" NPT water supply inlet and 1¼" NPT
drain outlet on unit
• Adequate supply pipe supports
• Minimum 4" (102mm) drain to accommodate 30
gallons (115 liters) per minute discharge for shower
waste
• OPTIONAL: sign-mounting hardware
Local codes may require the installation of a backflow
prevention valve to complete proper installation. Compliance
with local codes is the responsibility of the installer. Valve
must be tested annually to verify that it is functioning
properly. Backflow prevention valves are not included
with the fixture and may be supplied by the contractor or
purchased from Bradley Corporation.
Step 1: Secure base to floor
1. Install three suitable anchors (supplied by installer) for ³⁄₈"
bolts in the floor.
2. Bolt the base to the floor anchors using ³⁄₈" bolts (supplied
by installer).
Step 2: Assemble components
1. Assemble the remaining unit components as shown on
page 4.
• Apply pipe sealant (by installer) to all male-threaded
pipe joints.
• Use the rubber grip pad provided or a strap wrench
around pipes when tightening to prevent marring. Place
the grip pad on the pipe, then put the wrench over the
grip pad and turn the pipe with the wrench.
• When connecting the steel chain, first connect the
chain to the "S" hook on the foot treadle. Then, with the
foot treadle raised up, straighten the chain and connect
a link to the "S" hook on the valve handle. Make sure
the chain is pulled tight and opens valve completely.
The length of chain will vary from unit to unit.
Notice! Once the chain length is determined and confirmed
to operate the valve correctly, use a pliers to close
all s-hook openings to maintain this setting.
• The bottom edge of the showerhead should be 86¾"
(2203mm) from the floor.
Step 3: Connect water supply
IMPORTANT! Do not rely on Bradley's Combination
Unit to support supply piping.
1. Connect water supply piping to 1¼" NPT inlet on unit (piping
by installer). Provide adequate supports (by installer) for
supply pipe using pipe hangers or other means.
2. Connect drain piping to 1¼" NPT drain outlet on unit (piping
by installer).
3. Hang the safety sign from the unit with the curtain hooks
provided (or mount it to the wall using sign-mounting
hardware by installer).
Bradley • 215-533 Rev. Y; ECN 12-05-033
26³⁄₈"
(670mm)
3¾"
(95mm)
Ø 1½"
(38mm)
86¾"
(2203mm)
to Floor
9"
(229mm)
152mm
(6")
36³⁄₈"
(924mm)
Top View From Bowl
Ø 10¾"
(273mm)
10½"
(267mm)
All dimensions assume standard thread
engagement. Variations in manufacturing allow
for +/- 1⁄8" (3mm) per threaded joint. To find
the tolerance of a dimension, add the number
of thread joints in between a dimension and
multiply it by 1⁄8" (3mm).
3/14/2013
S19-310SS
25½"
(648mm)
66"
(1676mm)
to Floor
6"
(152mm)
9"
(229mm)
Ø 9" (229mm)
Flange with (3)
Ø ³⁄₈" (10mm)
Holes on Ø 8"
(203mm) Bolt
Circle
3