Kohler Sterling 7114 Série Guide D'installation Et D'entretien page 12

Masquer les pouces Voir aussi pour Sterling 7114 Série:
Table des Matières

Publicité

Diagrama de instalación (cont.)
medir por el lado expuesto del material de la pared. Las dimensiones del diagrama
de instalación son cruciales para una correcta instalación. Construya la estructura y
coloque las tuberías con precisión.
1.
Construct the Framing
NOTE: Refer to the "Roughing-In" section for dimensions.
Framing Provisions
WARNING: Risk of product and property damage. The bath must be supported
by the subfloor.
The bath with apron must be attached to the studs on three sides.
A subfloor must be installed. The bath must be positioned to allow clearance for
drainage through the floor joists or slab and to allow convenient plumbing
installation.
Studs must be positioned roughly as shown in the "Roughing-In" section to
properly fasten the walls. Other stud locations are optional except for those which
must meet the load-bearing requirements of local building codes. Studs must also
allow for the installation of plumbing fittings.
NOTE: If the wall surrounds will be installed to a masonry wall, make provisions for
plumbing connections. For the plumbing end wall, construct a separate frame wall a
minimum of 6" (15.2 cm) from the masonry wall. For the remaining walls, use 2x2
furring strips to provide stud locations.
Make sure the outer stud is correctly positioned with the vertical wall flanges. The
outer edge of the stud should align with the edge of the wall flange. 7114 and
7124 series should be 31-1/4" (79.4 cm) from the back wall. 7115 series should be
33-1/4" (84.5 cm) from the back wall.
NOTICE: Accessories that require backing or support are not recommended for this
installation. Installing these accessories could void the warranty.
Ensure fiber or other soft insulation does not drop down into the water channel.
Cover or seal any loose material. Failure to do so may cause wicking of water
from the water channel into the insulation which may induce mold, leakage, or
mildew. Ensure the channels are free of debris after installation.
For Above-the-Floor Drain Baths
Ensure the drain piping can pass through the wall and that the load bearing
requirements of the wall are satisfied. Modify the framing or raise the subfloor as
required to obtain clearance.
Construct 2x4 stud framing for your particular installation according to the
"Roughing-In" section.
Ensure that the framing for each stud is plumb and square within 1/8" (3 mm).
Shimming will be required if tolerances are not met.
If possible, construct an access panel in the plumbing end wall to simplify future
maintenance of all plumbing connections.
1065823-2-D
12
Sterling

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Sterling 7115 sérieSterling 7124 sérieSterling 7116 série

Table des Matières