LEFT SIDE RAIL INSTALLATION
1. Remove paper backing from left side rail.
2. Set the left side rail (4), on top of the truck box with adjuster screws
toward the front. Close Endgate, then align the rear edge of the
side rail (1), with the inside edge of the tailgate (3).
3. Place left side rail assembly (2) into the cover assembly (1). Be
sure latch (3) in the cover assembly engages into the slot in the
side rail assembly.
NOTE: There should be a 1/8" or less gap between the
cover assembly (1) and the side rail (2). If gap is larger
than 1/8" (5) move outer clamp to inner notch on clamp 1.
Soft Rollup Tonneau Cover Package
ALL INFORMATION WITHIN
DATE
ABOVE BORDER TO BE PRINTED
EXACTLY AS SHOWN ON 8.5 x 11
WHITE 16 POUND NON-BOND
RECYCLABLE PAPER.
PRINT ON BOTH SIDES, EXCLUD-
ING TEMPLATES.
TO BE UNITIZED IN ACCORDANCE
WITH GM SPECIFICATIONS.
AUTH
REVISION
4. Follow page to 2 to install Clamps (2) to left side rail (1).
NOTE: Verify the gap between the adjuster screws (3) and
SLYRW PRXQWV LV $GMXVW LI QHHGHG 'R WKLV RQ
both the Right and Left side rails.
5. Clean painted surface (1) using a 50%/50% mixture of rubbing
alcohol and tap water. Remove paper from clear tape strip (2)
and apply to painted surface (1).
NOTE: Tape strip is applied to both sheet metal sufaces
where rear latches are located.
PART NO.
REV 22JA13
INSTALLATION INSTRUCTIONS
DR
TITLE
Soft Rollup Tonneau Cover Package
PART NO.
22890222
22890222
SHEET
SHEET
21
OF
21
OF