Clamp Installation - Gm 22890222 Instructions D’installation

Table des Matières
Les langues disponibles

Les langues disponibles

RIGHT SIDE RAIL INSTALLATION
1. Remove paper backing from right side rail (4).
2. Set the right side rail (4) on top of truck box with the adjuster
screw towards the front.
NOTE: The rear of side rail will not have the adjuster
screw (2).
3. Be sure endgate (3) is closed, then align the rear edge of the
side rail (1) with the inside edge of the endgate (3).
Soft Rollup Tonneau Cover Package
ALL INFORMATION WITHIN
DATE
ABOVE BORDER TO BE PRINTED
EXACTLY AS SHOWN ON 8.5 x 11
WHITE 16 POUND NON-BOND
RECYCLABLE PAPER.
PRINT ON BOTH SIDES, EXCLUD-
ING TEMPLATES.
TO BE UNITIZED IN ACCORDANCE
WITH GM SPECIFICATIONS.
AUTH
REVISION

CLAMP INSTALLATION

1. Position the outer clamps (1) (marked CLAMP) on right side rail (2).
2. Position the teeth of the clamps (1) with the side rails (2) using
the center groove.
3. If the truck box is equipped with molded bed rail protectors,
remove the plastic insert (2) from the clamps and position teeth
on clamps (3) with the side rail using the outer groove.
PART NO.
REV 22JA13
INSTALLATION INSTRUCTIONS
DR
TITLE
Soft Rollup Tonneau Cover Package
PART NO.
22890222
22890222
SHEET
2
SHEET
2
21
OF
21
OF
Table des Matières
loading

Ce manuel est également adapté pour:

2312900323128998

Table des Matières