Télécharger Imprimer la page

HUUM Flow Mode D'emploi page 7

Poêle pour sauna

Publicité

1
1.
Place the ash grate in place
2.
Push the ash drawer into place
3.
Install the lower cleaning hatch through the opening of
the upper cleaning hatch
4.
Install the upper cleaning hatch
5.
Add a flue pipe to the leg of the chimney to improve draft.
Preferably at least 1 metre (not included in the set).
Figure 5. Assembling the stove for pre-installation heating.
Heat the sauna stove in well-ventilated outdoor area that is sheltered
from the wind. This will enable the stove surfaces heat up evenly.
• Before heating for the first time, be careful not to scratch the
surface of the sauna stove.
• Remove the stone grate for pre-installation heating.
• Do not lay stones on the body of the sauna stove.
• Do not throw water on the sauna stove during first heating.
• 1-2 hearths of firewood is enough for the first heating.
• You can stop heating when no visible smoke or steam is
released from the surface of the stove.
• During the pre-installation heating, keep the door
slightly open. Do not close the door at any stage during
the first heating. (See Figure 6.)
ATTENTION!
body and detach!
• To improve draft, you can use flue pipes used in
final installation.
5
2
The door seal may stick to the heater
4
3
Figure 6. Door position
7

Publicité

loading

Ce manuel est également adapté pour:

Flow lsFlow miniFlow mini ls