MANUAL FOR ECOSOFT PINK SOFTENERS
5. INSTALLATION
7. Remove the front panel by pulling the locking tabs on the left and right side. Run the power
cord through the cord guide in the control valve's backplate and connect it to 12 VAC socket on
the circuit board. Plug the power supply in the mains to power up the system.
8. Start manual regeneration of the system. Scroll through regeneration to backwash step if it
is not the first step of the sequence. When the control valve starts backwashing, turn on mains
water supply slightly at first. Air will be displaced from the system via drain line while the pressure
tank is being filled with water. When the tank is full, water will start flowing down the drain line.
At this point, fully open mains water supply.
Allow the system complete regeneration, then perform one more manual regeneration.
5.1 OPTIONAL EQUIPMENT
Softening systems can be additionally equipped with a Clack or Multiblock bypass valve. The Clack
bypass valve is attached directly to the inlet and purified water pipes and has 4 operating modes,
listed below:
NORMAL OPERАTION
"TREATED"
WATER EXIST
DIAGNOSTIC MODE
WATER EXIST
This manual is the intellectual property of Ecosoft. Copying and reprinting is prohibited. © 2024
SUPPLY WATER
ENTERS
SUPPLY
SUPPLY WATER
ENTERS
BYPASS OPERАTION
SUPPLY
SUPPLY WATER
WATER EXIST
ENTERS
SHUT OFF MODE
NO WATER
SUPPLY WATER IS SHUT
EXIST
OFF FROM THE HOUSE
AND THE VALVE
9