Quick Commissioning; Mode - Fig; Operating Test; Using The Remote Controls - Fig - Somfy Cb 230 Rts Manuel D'installation

Masquer les pouces Voir aussi pour CB 230 RTS:
Table des Matières
CB 230 RTS

4 - QUICK COMMISSIONING

4.1 Memorising the remote controls for operation in
complete opening mode - Fig. 8
It is possible to memorise up to 36 control channels.
memorised, this channel will be cleared.
[1].
PROG
The red indicator will come on permanently.
[2].
4.2 Checking the motors' direction of rotation
[1].
[2]. Manually place the gate leaves in the intermediate position and lock the
motors.
[3]. Switch the mains power supply back on.
[4]. Control the gate with a memorised remote control or a control point
connected to the wired control input.
The gate should open.
[5].
transpose the wires to terminals 5 and 7 or 8 and 10 in the control box.
[6]. Unlock the motors.
[7]. Manually place the gate leaves in the closed position, then lock the
motors.
[8]. Switch the mains power supply back on.
4.3 Programming the gate leaves' travel - Fig. 9
Program the gate leaf travel
programming.
[1]. Press the SET
The POWER and SET
[2]. Press the button on a memorised remote control to start programming.
[3].
reached, press the button on the memorised remote control again.
Note
[4].
slowdown is required, press the button on the memorised remote control.
speed.
in step [3].
Note
[5].
the button on the memorised remote control. The additional seconds will
Programming is complete. The POWER indicator is lit steady.
Note
leaves are completely open.
active.
Copyright © 2017 SOMFY ACTIVITES SA. All rights reserved.

5 - OPERATING TEST

5.1 Using the remote controls - Fig. 10

5.2 Operation of the photoelectric cells
5.3 Operation of the safety edge
5.4
See the user booklet.

6 - CONNECTING ADDITIONAL DEVICES

6.1 General wiring diagram - Fig. 11

Terminals Terminal
Connection
indication
1
L
230 V power supply
2
N
3 - 4
Earth
5 - 6 - 7
M1
Motor 1
M2
Motor 2
11 - 12
Flash
230V orange light
output
13 - 14
Pulse
lock
15
0 V
24 V accessories
power supply
16
24 V
17
Test
18
Shared
Sec Cell - o
Cell active during
opening
20
Sec Cell - c
Cell active during
closing
21
ESE
edge
22
Contact
COMPLETE/
OPENING control
input
23
Shared
24
Contact
PEDESTRIAN/
CLOSING control
input
25
Conductor
Aerial
26
Braid
6.2 Description of the various additional devices
Photoelectric cells
• Wiring to "Cell active during opening input" - Fig. 12
• Wiring to "Cell active during closing input"
- With autotest - DIP SW12 to ON - Fig. 13
- Without autotest - Fig. 14
Comments
Motor which opens
Motor which opens
second
Flashing managed by
the orange light
Module to control the
lock
accessories on all
outputs
4
Table des Matières
loading

Table des Matières