Mitsubishi Electric SVZ-KP12NA Manuel D'installation page 30

Masquer les pouces Voir aussi pour SVZ-KP12NA:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

L B
PLASTIC TIE
PLASTIC TUBE
Model
SVZ-KP12, 18, 24
3
4
SVZ-KP30, 36
5
Step. 11 Reinstall the coil assembly along with the bracket(s) that secure(s) it. Failure to reinstall the
brackets will result in capacity loss and condensation formation inside the cabinet. Be sure the
thermistor harness is reconnected inside the coil portion of the cabinet. Refer to 10.3 steps 1 to 4 to
reassemble the panels. Ensure the proper knockouts are removed for drainage and electrical
connections.
Horizontal Left
Fan assembly rotation required.
© 2020 Mitsubishi Electric US, Inc.
SVZ-KP12,18, 24, 30, 36NA
CORRECT
INCORRECT
5/8"
(15mm)
Tube Length
4.9 in. (125 mm)
6
7
6.9 in. (175 mm)
8
9
DETAIL A
PLASTIC TIE
PLASTIC TUBE
MITSUBISHI ELECTRIC CORPORATION
DATE
DIM.mm
DRAWN
SCALE
0.200
CHECKED
NTS
DESIGNED
10
11
12
13
④ Reattach Bracket(s)
⑤ Electrical Knockouts
⑥ Side Drain Pan on bottom
⑦ Motor on bottom
⑤ Electrical Knockouts
⑧ Auxiliary Drain Pan
⑨ Primary Drain 3/4" FPT
⑩ Airflow
30
Specifications are subject to change without notice.
E
F
G
H
ITEM
MODEL NAME
COMMERCIAL TOLERANCE
WORK
GRADE
I
CASTING
FINE COARSE
PRESS WORKING
A
B
C
D
E
GAS CUTTING
A
B
SHEARING
A
B
MACHINING
MEDIUMCOARSE
3D
CONFIDENTIAL
APPROVED
J
18
14
15
16

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Svz-kp18naSvz-kp24naSvz-kp30naSvz-kp36naM série

Table des Matières