Mitsubishi Electric SVZ-KP12NA Manuel D'installation page 24

Masquer les pouces Voir aussi pour SVZ-KP12NA:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

SVZ-KP12,18, 24, 30, 36NA
Step. 3b Next, remove the smaller panels covering the drain holes and refrigerant lines by first sliding
in the direction indicated above.
Step. 4 Remove all electrical connections entering the control box. This includes the motor connector.
Pull these harnesses from the control box. Next, remove the (2) screws indicated in the image and
remove the control box from the air handler.
© 2020 Mitsubishi Electric US, Inc.
24
Specifications are subject to change without notice.

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Svz-kp18naSvz-kp24naSvz-kp30naSvz-kp36naM série

Table des Matières