Mitsubishi Electric SVZ-KP12NA Manuel D'installation page 38

Masquer les pouces Voir aussi pour SVZ-KP12NA:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

IMPORTANT
Over-tightening the drain connection could result in drain pan breakage and failure.
The secondary connection should be connected to a separate drainage system. Run the
secondary drain so the occupants will be able to notice water flowing through the
secondary drain indicating a blockage in the primary drain. Optional use for the secondary
is a primary drain line overflow switch (provided by others). This device will shut the
cooling operation unit down in the event of a primary drain line blockage. See wiring
section for connecting this device.
Horizontal (Left or Right):
If the unit is installed horizontally, remove the knockout in the front panel to gain access to the side drain
pan connections. Attach the connector as described above and route drain line. Any vertical drain pan
openings must be covered to eliminate air loss which will decrease the capacity of the unit.
IMPORTANT
Over-tightening the drain connection could result in drain pan breakage and failure.
The secondary connection should be connected to a separate drainage system. Run the
secondary drain so the occupants will be able to notice water flowing through the
secondary drain indicating a blockage in the primary drain. Optional use for the secondary
is a primary drain line overflow switch (provided by others). This device will shut the
cooling operation unit down in the event of a primary drain line blockage. See wiring
section for connecting this device.
© 2020 Mitsubishi Electric US, Inc.
SVZ-KP12,18, 24, 30, 36NA
38
Specifications are subject to change without notice.

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Svz-kp18naSvz-kp24naSvz-kp30naSvz-kp36naM série

Table des Matières