newmotion Business Lite 2.1 Manuel D'installation page 15

Masquer les pouces Voir aussi pour Business Lite 2.1:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

6. OPTIONAL: DYNAMIC POWER SHARING
For a successful installation of the Business Lite &
Pro charge points with Dynamic Power Sharing, the
following requirements need to be met:
- The group consists of one Business Pro and one or
more Business Lites
- All chargepoints are either Business 2.0
or Business 2.1
- All charge points are connected by UTP cables in a
either a daisychain or star configuration.
- All charge points should be online before the
configuration can be completed
- The available charge capacity for all charge points
combined is known
- The charge capacity for each charge point is known
- Phase rotation has to be applied according to
installation form (see 6.1)
The following is recommended:
- The installation is executed with 3-phase / 32 A power
cabling for each charge point.
- Ideally, there is at least 10 A per phase available per
charge point for the group at full occupancy
INSTALLATIEHANDLEIDING – P15
INSTRUCTION MANUAL – P15 | P15
6.1 PHASE ROTATION (3-PHASE ONLY)
To make optimal use of the available power phase
rotations should be used. Beware, when this is not
correctly configured, Dynamic Power Sharing will not
work correctly and could result in overloading the grid
connection. Installation should be carried out, and
charge points should be connected, in accordance
with/to the installation procedure of this manual. The
phase rotation should be applied at the bottom of the
kWh meter. Put the L1 (Brown) and Neutral (Blue) always
in the terminal block.
The position in the installation form determines the
phase rotation the charge point will receive. There are
three different phase rotations which are used:
1. L1 L2 L3
2. L3 L1 L2
3. L2 L3 L1
Phase rotation L1 L2 L3 is the factory connection. To
change this to L2 L3 L1 or L3 L1 L2 loosen the three
left screws holding the power cables on the bottom.
Rearrange them and tighten the screws back up. Make
sure the power cables are firmly reapplied in the bottom
of the kWh meter. Failing to do so can result in fire,
electrocution or severe injury.
The order for each phase rotation is as following:
Description
Installation form /
Settings charge point
L1L2L3
L3L1L2
L2L3L1
VERSION 0129NM02INT01
0383NM02INT03
Order of power cables
located to the bottom
of charge point
(from left to right)
Brown, Black, Grey, Blue
Grey, Brown, Black, Blue
Black, Grey, Brown, Blue

Publicité

Table des Matières
loading

Table des Matières