Change Of Size - FAR KJ 60 Mode D'emploi

Masquer les pouces Voir aussi pour KJ 60:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 14

CHANGE OF SIZE

Depending on insert thread, it is necessary to replace the couple "tie-rod/head" as follows:
PICTURE 1. Loosen the ring nut by means of a 25-mm standard spanner and remove the riveting tool head.
PICTURE 2. Make the pin supplied pass through the pertinent service hole located on the cone carrying head and apply a light
pressure on the head inwards, in order to dechuck the tie rod clutch., at the same time, unscrew the tie rod and extract it.
PICTURE 3-4. Keep the clutch dechucked and screw the tie rod size desired. When the replacement of the tie rod has been
performed, swing it until you hear a click. Them assembly the proper head and lock it with the corresponding ring nut loosen
before. Each time you carry out any change of size, repeat the adjustment operations as specified in the previous pages.
WARNING! DESCONNECT AIR FEED WHEN PERFORMING THOSE OPERATIONS.
1
3
12
GB
2
25 mm.
4
Date 07-2016
KJ 60
25 mm.
Revisione - 21

Publicité

Table des Matières
loading

Table des Matières