Télécharger Imprimer la page

CIARRA CBCS6102 Mode D'emploi page 11

Publicité

Les langues disponibles

Les langues disponibles

3) First use a pencil to mark the installation position on the wall, then
use a Measuring Tape to measure the height from the stove surface
to the hood (the center point of aluminum grease filter) and use a
Spirit Level Ruler to maintain the level, then use a pencil to draw a
horizontal line along the level.
4) Poke the 7 perforated positions on the 1:1 Installation Diagram, then
align with the center point of aluminum grease filter on the
Installation Diagram with the horizontal line on the wall, then tape
the Installation Diagram to the wall, and use a pencil to mark the
perforated positions on the wall in the corresponding positions.
Tape
1:1 Installation Diagram
COMPONENTS:
Part 7: 1 :1 Installation Diagram X 1
Spirit Level Ruler
650mm
750mm
9
Installation
EN

Publicité

loading

Ce manuel est également adapté pour:

Cbcs9102Cbcb6102Cbcb9102