Télécharger Imprimer la page

Daikin Altherma 3 H HT EPRA18DAV3 Manuel D'installation page 7

Masquer les pouces Voir aussi pour Altherma 3 H HT EPRA18DAV3:

Publicité

Use 4 sets of M12 anchor bolts, nuts and washers. Provide at least
150  mm of free space below the unit. Additionally, make sure the
unit is positioned at least 100  mm above the maximum expected
level of snow.
Anchor points
800
Pedestal
When installing on a pedestal, make sure that the discharge grille
still can be put in its safety position. See
discharge grille, and put the grille in safety
(mm)
a
Make sure not to cover the drain hole in the bottom plate
of the unit.
3.2.2
To install the outdoor unit
1 Carry the unit by its slings, and put it onto the installation
structure.
±150
kg
2 Fix the unit to the installation structure.
EPRA14~18DAV3+W1
Daikin Altherma 3 H HT
4P586100-1C – 2020.01
(mm)
"6.3  To remove the
position" [ 4  15].
4× M12
4× M12
3 Remove the slings (and screws), and dispose of them.
3.2.3
To provide drainage
Make sure that condensation water can be evacuated properly.
NOTICE
If the unit is installed in a cold climate, take adequate
measures so that the evacuated condensate CANNOT
freeze. We recommend to do the following:
▪ Insulate the drain hose.
▪ Install a drain tube heater (field supply). To connect the
drain tube heater, see
wiring to the outdoor
NOTICE
Provide at least 150  mm of free space below the unit.
Additionally, make sure the unit is positioned at least
100 mm above the expected level of snow.
Use the drain plug (with O-ring) and a hose for drainage.
3 Unit installation
"5.3  To connect the electrical
unit" [ 4  10].
Installation manual
7

Publicité

loading