Télécharger Imprimer la page

GLW AC 100 Notice Technique page 21

Pince à sertir pneumatique

Publicité

Les langues disponibles

Les langues disponibles

AC 100
Commissioning
 Check whether finger guard plate (1) is present
and is sitting firm.
 Check whether the die set (2) is free from
foreign matter.
 Check whether the pneumatic tubing nuts (3)
have been tightened firmly.
 Check the compressed-air supply:
min. 4 bar, max. 6 bar filtered air.
 Connect the tubing plug-in connector (4) to the
compressed-air supply.
Operation
 Introduce stripped wire, with wire-end ferrules
already fitted, at the side (1) in the hole
assigned to the cross-section.
 Press the lever (2), the crimping process will be
triggered.
 Release the lever (3), the crimped wire can be
removed again (4).
08/18
MAINTENANCE
Fig. 2
Fig. 3
Putting into operation
Operation
5

Publicité

loading

Produits Connexes pour GLW AC 100