Télécharger Imprimer la page

Samsung DV53BB8900 Serie Mode D'emploi page 30

Publicité

Les langues disponibles

Les langues disponibles

Installation
STEP 5 Power on (for gas models)
Make sure all gas connections, the exhaust line, and all wiring are connected correctly. Then, plug the
power cord into a power source and check the dryer's installation and operation using the final checklist in
Step 6 below.
STEP 6 Final Check
When the installation is complete, confirm that:
• The dryer is plugged into an electrical outlet and grounded properly.
• The exhaust ductwork is connected, and the joints are taped.
• You have used rigid or stiff-walled flexible metal duct material, not plastic flexible duct.
• The dryer is level and is sitting firmly on the floor.
• The dryer starts, runs, heats, and shuts off properly.
• The gas is supplied properly with no leaks (For gas models only).
CAUTION
The burner may not ignite initially due to air in the gas line. Allowing your dryer to operate on a heat setting
will purge the line. If the gas does not ignite within 5 minutes, turn your dryer off and wait 5 minutes. Be
sure the gas supply to your dryer has been turned on. To confirm gas ignition, check the exhaust for heat.
Connect the drain hose
Draining directly into a drainage system
30
English
DV8900HB_SimpleUX_WEB_OID57652_01_English.indd 30
DV8900HB_SimpleUX_WEB_OID57652_01_English.indd 30
• We strongly recommend draining condensed water
directly into your drainage system instead of draining
to the built-in water tank.
• Use the provided accessory hose (long drain hose) to
drain condensed water directly to your drain system
instead of draining to the built-in water tank (which
is a default method).
• Use the built-in water tank only if you cannot drain
the condensed water directly to a drainage system.
NOTE
As a factory default, this dryer is set to use the built-in
water tank to drain condensed water.
2023/6/29 15:27:58
2023/6/29 15:27:58

Publicité

loading

Ce manuel est également adapté pour:

Dv53bb8900hda2