Télécharger Imprimer la page

Siemens 3RB22 Manuel De L'appareil page 36

Relais électronique de surcharge
Masquer les pouces Voir aussi pour 3RB22:

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 43
Operation
5.5
Test
Testing
Dura-
phase
tion
1
3 s
2
3 s
3
18 s
4
1) Execute the configuration test to check the activated functions after a function expansion module has
been plugged in.
2) The flickering of the three red LEDs initiates the relay switch-off. Up to this moment, it is possible to
abort the user test without switching off the relays.
26
During testing, all protective functions remain activated. A tripping
operation/warning results in abortion of the test!
The test is started by pressing the TEST/RESET button for t > 1 s.
Description
LED test
1)
Configuration test
Internal tests
2)
Relay test
Comment
Check whether all LEDs are flashing
Activated functions are indicated by flickering
of the respective LEDs. The READY LED
stands for the autoreset function.
System executing internal tests.
During testing, the user can compare the
maximum motor current of the 3 phases with
the analog output current.
System opens the outputs 95/96 and 05/06
3ZX1012-0RB22-1AA1

Publicité

loading

Ce manuel est également adapté pour:

3rb23