newmotion Home Advanced 3,7 Manuel D'installation page 9

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

SMART, SAFE & FAST CHARGING
YOUR CHARGE POINT
Purchased from:
– – – – – – – – – – – – – – – – – – – – – – – – – – – – –
In case of defects or malfunctions, please contact:
– – – – – – – – – – – – – – – – – – – – – – – – – – – – –
Phone number:
– – – – – – – – – – – – – – – – – – – – – – – – – – – – –
PLEASE CHECK THE PACKAGE
CONTENTS ON RECEIPT
Package contents
Charge point
(Optional: attached charger cable)
Wall bracket
Rubber grommets (various sizes)
1 x M4 x 20 mm bolt (Torx)
6 x M4 x 12 mm bolts (Torx)
4 x M8 x 12 mm bolts (Torx) and washers
4 x M8 x 35 mm bolts (DIN 912) and washers
2 x plastic spacers
Sticker sheet for the sides of the charge point
GPRS reception
The Vodafone GPRS signal strength (2G) must be between
-56 and -80 dBm. At weaker signal, please contact
NewMotion.
Space in distribution box
There
needs
to
be
sufficient
room
in
the
distribution
board

to add any necessary circuit(s).
Presence of solar panels
Are solar panels installed? Install the charge point on
the same phase(s) as the solar panels in order to make
maximum use of the power generated by the panels.
SAFETY
The electrical system must be voltage-free during
the entire installation procedure.
The installation procedure must be carried out by a
trained electrician who works in accordance with
the relevant laws and regulations such as BS 7671.
Do not carry out installation work in rain or when
the humidity is above 95%.
INSTALLATION INSTRUCTION – ENGLISH – P7
REQUIRED MATERIALS AND TOOLS
General
Charge point
Rubber grommets (provided)
1 x M4 x 20 mm bolt (Torx) (provided)
6 x M4 x 12 mm bolts (Torx) (provided)
Power
cable
(see
"Installation
specifications)
Cross-head screwdriver (Pozidriv size 1)
Torx screwdrivers (T20 and T45)
Voltage tester
Spirit level
To attach the charge point to the wall bracket
Wall bracket (provided)
2 x M8 x 12 mm bolts (Torx) and washers (provided)
3 x screws, at least 6.3 x 60/70 mm with washers
and plugs
Drill and bit
To attach the charge point to the pole in soil
Pole and concrete base
4 x M8 x 12 mm bolts (Torx) and washers (provided)
4 x M8 x 35 mm bolts (DIN 912) and washers (provided)
DIN screwdriver (912)
Shovel
To attach the charge point to a pole in concrete
Pole
4 x M8 x 12 mm bolts (Torx) and washers (provided)
4 x wedge bolts and 4 x M8 nuts
Drill and bit
Optional: Ethernet connection
In certain situations the charge point can be connected
using an Ethernet cable at locations where there is no or
inadequate GPRS signal. There are, however, additional
requirements for this. In this situation, always contact
NewMotion on: NL: +31 (0)88 010 9500
UK: +44 (0)203 868 1036
UTP cable
RJ45 connectors
Optional: connecting to a smart meter (DSMR4.0)
The charge point can be combined with all smart meters
that comply with the DSMR4.0 standard. During installa-
tion, always link a UTP cable from the mains to the charge
point for future use. When connecting to a smart meter,
contact NewMotion in advance on:
NL: +31 (0)88 010 9500
UK: +44 (0)203 868 1036.
UTP cable
RJ11 connectors
Tape measure
Crimping tool (RJ45)
Crimping tool (RJ11)

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Home advanced 22

Table des Matières