INSTALLATION
INSTALLATION PROCEDURE
1.
 
 
 
 P repare
the
cabling
(see
"Installation
specifications"

later on in this guide).
2. Attach the wall bracket at the desired height
(+/- 1 metre) on the wall.
3. Twist the socket lid or dummy socket anti-clockwise
and
out
of
the
cover
of
the
charge
point.
Then
firmly

pull the cover from the rear edge to open the charge
point. Do not use any objects to do this.
4. Put the charge point on the wall bracket to check its
placement. On the wall, mark the positioning of the
bottom two attachment points on the charge point
and
select
the
appropriate
fixtures
(plugs,
screws
and

washers).
5. Secure the charge point to the wall bracket using
the two M8 x 12 mm bolts and washers provided.
Then secure the charge point to the wall using the
bottom two attachment points. Ensure that the grey
spacers are placed on the back of the charge point
at the bottom two attachment points.
6. Select the appropriate grommet to suit the cable
width and place it on the opening of the power cable
inlet. Moisten if necessary to make it easier to feed
the power cable through.
7. Connect the power cable and secure using the cable
clamp: fasten the earth wire and the neutral wire to
the DIN rail-mounted terminal blocks. Attach the
phase wire(s) in the right order to the bottom of the
kWh meter.
8. Attach the black grommet to the opening next to the
power cable inlet to make the charge point watertight.
This step is not required for an attached charger
cable.
9. Note when using an attached charge cable: Select the
appropriate grommet to suit the cable width and place
it on the opening of the power cable inlet. Connect the
power to the attached charge cable on the designated
spring clips on the left of the charge point and secure the
cable well with the cable clamp. Connect the AMP plug
to the connector on the left of the charge point to
communicate with the car.
INSTALLATION INSTRUCTION – ENGLISH – P10
10. Note when combining with a smart meter (DSMR4.0):
Feed the UTP cable through the rubber stop on the
data cable inlet and then connect it to the P1 port.
Call NewMotion to activate the smart meter:
NL: +31 (0)88 010 9500 UK: +44 (0)203 868 1036.
11. Note when using Ethernet connection: Feed the UTP
cable through the rubber stop on the data cable inlet
and then connect it to the Ethernet port.
Call NewMotion to activate the ethernet-connection:
NL: +31 (0)88 010 9500 UK: +44 (0)203 868 1036.
12. Note when using a pole: Earth the pole with the earth
wire via the lower right bolt attachment on the charge
point (see earthing diagram).
13. Connect the power cable to the mains.
14. Switch on power to the charge point
(charge point starts up).
15. Check that the charge point is connected to the net-
work. A quick check can be done via chargeportal.new-
motion.com/test. Simply enter the serial number into
the
search
field
and
click
"Search".
"Online"
should

appear after the serial number. If 'Online' does not
appear",
check
whether
the
charge
point
is
properly

connected and try again. For persistent issues, please
contact
NewMotion on: NL: +31 (0)88 010 9500
UK: +44 (0)203 868 1036.
16. Secure the cover on the charge point. Tighten the four
M4 x 12 mm bolts provided around the socket so that
the cover closes on the rubber seal but the rubber
seal does not deform. Tighten the other two M4 x 12
mm bolts provided on the bottom of the cover.
17. Twist the socket lid or dummy socket clockwise in
the cover and lock using the M4 x20 mm bolt
provided. The bolt must be secure, but not too tight.
18. Attach the appropriate stickers provided
(1-phase or 3-phase) to the sides of the charge point
in the designated indented spaces.
19. Indicate which circuit(s) the charge point is connected
to in the distribution board.
NB: The charge point must have been activated online by
the user to make it ready to charge. Activation is easy via
my.newmotion.com using the serial number of the
charge point. The charge card must also be activated.