Télécharger Imprimer la page

ITT Goulds Pumps AquaBoost II 3AB2 Installation, Exploitation Et Maintenance page 5

Publicité

Les langues disponibles

Les langues disponibles

3. System Design
Note
Systems MUST be designed by qualifi ed technicians only and meet all applicable state and local
code requirements.
The following fi gures show a typical constant pressure system using the AquaBoost II Controller. Connection
can be made directly to a water supply or water can be drawn from a supply tank. Figure 1 shows a typical set
up for a supply tank fed by a well.
Circuit
Breaker
Disconnect
Figure 1
System Layout
for supply tank
Figure 2 shows a set-up for boosting the pressure of an existing water supply. Both confi gurations allow pump
maintenance without main line shut-off.
Home Supply
Disconnect
Figure 2
System Layout for
municipal hook-up
Note
Fittings and valves are not included with AquaBoost controllers.
Home Supply
AquaBoost
Controller
Transducer
Gauge
Tank
Motor/Pump
AquaBoost
Controller
Circuit
Breaker
Gauge
Tank
Motor/Pump
Check Valve
Isolation Valves
Unions
Relief
Valve
Check Valves
To Drain
Check Valve
Isolation Valves
Unions
Transducer
Relief
Valve
Check Valve
To Drain
5
Well Supply
Atmospheric
Storage Tank
Water Main

Publicité

loading

Ce manuel est également adapté pour:

Goulds pumps aquaboost ii 3ab2wGoulds pumps aquaboost ii 5ab2