Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 20
2. Label the selected drill holes at the specified markings with a pencil.
Drill horizontal holes into the 2 drill hole markings with a suitable drill bit and clean out
the holes.
Now screw in the wall mounting elements one after another with the appropriate
dowels/anchors.
Check to see if the wall bracket is levelly seated using the level before tightening the
screws
Now hang the Design infrared radiator in the 4 retaining devices. Check to see if all 4
attachments are secure.
Please observe that only suitable dowels/ anchors are to be used. For this, we have compi-
led a selection of suitable products from fischer Deutschlands Vertriebs GmbH
(Table Anchor Materials).
All radiators are supplied with suspension brackets with slotted holes 8.5 x 12.75 mm.
Wall mounting:
Material:
Concrete C20/25 FAZ II 8/10
Aerated concrete GB 10
Honeycomb brick UX 10x60
Solid brick
Preforated sand
lime brick
Solid sand
lime brick
Plasterboard
Ceiling mounting:
Material:
Concrete C 20/25 FAZ II 8/10
Ceiling installation
After successful installation of the ceiling structure, the Design infrared radiator is pushed
and advanced in the rails until all four points snap into the groove. This secures the element.
16
Anchor type: Item no. Approval:
094871 ETA-05/006
05092
077871 without approval
FUR 8x80 SS 070130 Z-21.2-1204
UX 10x60
077871 without approval
FUR 8x80 SS 070130 Z-21.2-1204
HM 6 x ... S
Anchor type: Item no. Approval:
094871 ETA05/0069
1. Push in until left knob screw is exposed
Allowed
load:
2,40 kN
Z-21.2-123
0,25 kN
(with 7 mm safety screws)
0,40 kN
0,40 kN
without approval
Allowed
load:
2,40 kN
2. Push back until all 4 knob screws snap into
place
Recommended
load:
0,20 kN
0,60 kN
dependent on panel
Recommended
load:

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

TaurusCetusVirgoLyraTucana

Table des Matières