Central Punching Of The Vertical Rod - Fapim FP16 Manuel D'instructions Et D'entretien

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

FP16

4.1.3 Central punching of the vertical rod

Place the window-post and ensure that the cremone machining is centred in the
above pins. Run the sliding stroke up to the left top of the window-post and lock it.
Insert the previously cut rod as shown to hit the stroke.
WARNING:
In case of RIGHT hand windows, get as far as the stroke as shown in the "DX" picture;
in case of LEFT hand windows, follow the indications shown the "SX" picture.
Push pedal to carry out rod punching.
GB
31

Publicité

Table des Matières
loading

Table des Matières