Maintenance And Repairs; General Information - Fein RSGEx18a Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 28
3 41 00 958 06 8.book Seite 21 Dienstag, 23. Februar 2016 2:10 14
Position
D
A
Required chain
of the running
length for each
axle
side
[mm] [mm] [mm]
II
400
414
1.782.0
450
413
1.898.0
500
412
2.019.0
550
411
2.144.0
600
409
2.273.0
III
600
383
2.302.0
650
383
2.433.0
700
382
2.566.0
750
381
2.702.0
800
379
2.840.0
IV
800
356
2.862.0
850
355
3.001.0
900
355
3.142.0
950
354
3.284.0
1.000
354
3.428.0
V
1.000
312
3.464.0
1.050
312
3.607.0
1.100
313
3.751.0
1.150
313
3.896.0
1.200
313
4.062.0
1.300
314
4.338.0
VI
1.300
293
4.355.0
1.400
295
4.651.0
1.500
297
4.950.0
1.600
298
5.250.0
1.700
299
5.553.0
1.800
300
5.857.0
1.900
301
6.162.0
2.000
301
6.468.0
2.100
302
6.775.0
2.200
303
7.083.0
2.300
303
7.391.0
2.400
303
7.700.0
2.500
304
8.009.0
2.600
304
8.319.0
2.700
305
8.629.0
2.800
305
8.940.0
2.900
305
9.251.0
3.000
305
9.562.0
*Reference number 3 02 31 013 02 7 consisting of 10 chain links,
each 635 mm long.
To attain optimum chain pre-tensioning, the halved chain links sup-
plied in the carrying case with a length of 31.75 mm can be used, if
need be.
Example:
For a pipe diameter of D=400 mm, 6 chain links
(reference number 3 02 31 013 02 7) are required.
Final work after completing each job.
Retract the cutting tool
Switch off the pipe milling machine
Remove the cutting tool
Unclamp the pipe milling machine.
For pneumatic machines:
After uncoupling the compressed-air hose, pour a little corro-
sion-preventing oil into the air supply of the pneumatic motor
and run it for a short time.
Close the hose opening with a protective cap.
Storing the pipe milling machine.
Protect the outer metallic parts against corrosion.
Store the pipe milling machine in a dry place.

Maintenance and repairs.

Total chain
i*
length
Maintenance and repairs.
[mm]
We recommend our customer service department (central repair).
3.564.0
6
Address at the end of this instruction manual.
3.796.0
7
Only use original FEIN spare parts.
4.038.0
7
!
4.288.0
7
Risk of injury
4.546.0
8
by switching ON unintentionallyn.
4.604.0
8
Before commencing any work on the pipe milling machine, disconnect
4.866.0
8
the mains plug or the compressed-air hose!
5.132.0
9

General information

5.404.0
9
5.680.0
9
Servicing work may only be carried out by qualified engineers.
5.724.0
10
Care and maintenance work mainly comprises the following:
6.002.0
10
- Cleaning the outside of the pipe milling machine and the clam-
6.284.0
10
ping chain
6.568.0
11
- Visual check of the entire pipe milling machine
6.856.0
11
- Changing the gear oil
6.928.0
11
- Filling the compressed-air maintenance unit with lubricant
7.214.0
12
- Greasing the movement thread and chains
7.502.0
12
7.792.0
13
- Greasing the guides of the tool spindle holder in the clamping
8.124.0
13
and transport device.
8.676.0
14
Care of the link chains
8.710.0
14
9.302.0
15
After removing most of the dirt on the chain with benzine used for
9.900.0
16
cleaning, petroleum or similar agent, clean it carefully moving the
10.500.0
17
chain links.
11.106,0
18
For guaranteeing sufficient lubrication, leave the chains in viscous
11.714.0
19
oil, e. g. gear oil SAE 140 for several hours.
12.324.0
20
!
Danger of accidents!
12.936.0
21
Before using the chain parts again, make a thorough visual check of the
13.550.0
22
chain links and ensure that they are in perfect condition. Change any da-
14.166.0
23
maged parts and replace any missing securing rings.
14.782.0
24
15.400.0
25
Tool spindle holder
16.018.0
26
Check the gear-oil level
16.638.0
27
17.258.0
28
If necessary, change the gear oil.
17.880.0
29
See also the section on "Lubricants and lubrication plan".
18.502.0
30
Checking the gear-oil level
19.124.0
31
Check the oil level and tightness of the tool spindle holder each
time before using:
Place the pipe milling machine with the side plate opposite the
tool protection lying on a horizontal base.
Remove the screw plug (25, Fig. A).
Please note:
The oil level is correct if a little gear oil is still just seeping from the
tapped hole.
If necessary, top up with gear oil (see the section on "Lubricants
and lubrication plan").
Screw on the screw plug again tightly.
Changing the gear oil
The gear oil is to be changed according to the number of operating
hours given in the table, however, at least ever 18 months.
Gear-oil change intervals
[operating hours]
First oil change after
Next oil change after
Our central repairs department carries out the oil change for you
and disposes of the used oil.
Drain the gear oil in its warm operating condition immediately after
storing the pipe milling machine.
en
RSG Ex 18 a (**)
RSG Ex 18 b (**)
RSG 18 a (**)
RSG 18 b (**)
RDG 18-3 a (**)
RDG 18-3 b (**)
20 – 40
80 - 120
80 - 120
200 - 250
21

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Rsgex18bRsg18aRsg18bRdg18-3aRdg18-3b

Table des Matières