Connections Diagram; Electric Heating 2 Kw (Additional Equipment); Run Test And Water-Tightness Test - HOESCH Reviva II EF02 Instructions De Montage Et D'utilisation

Le système d'hydromassage
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 27

02.03.2 Connections diagram

ON
ECE
ON
1
2
3
4
OFF
1
2
1
2
1
2
1
2
GB

02.03.3 Electric heating 2 kW (additional equipment)

After switching the electric water heater 2 kW on, the rotating water massage jet is switched on automatically. The bath
water temperature is maintained at the constant level of approx. 37°C.
In case of a version with integrated electric heating 2 kW the system is factory-equipped with an electric part and control
components. In such a situation a separate electric connection should be made for part of the heating power and it
should be protected separately 10 A.
Ensure polarity according to the connections diagram. Connection to the power supply system and operation
of the system only with the protection cable and connected equalizing of potentials. The power supply
connection of the system control unit and for part of the heating power should be protected with a common
current trip device 30mA.
L
N
4
L
N
03

Run test and water-tightness test

Once you take steps described at point 02, please proceed with the test run. For this purpose clean the bathtub, fi ll it
with water (temperature 40 +/- 5˚C) until overfl ow level and then turn on whirl massage for 10 min. During this, please
monitor max. and min. speed. Then, turn off the whirl system for 15 min. After one hour, check water-tightness of pipes
and connectors. During next test run a disinfection must be done according to point 15.
18
EF.02
V+
V-
5A/T
5A/T
4
6
4
6
4
5
10
13
13
13
L
N
L
N
L Lvar
N
PE
PE
PE
MAIN
230V BLOWER
PUMP
PE
1
L1
N5
PE
N6
L2
PE
PE
3
PE
10 A
10 A
RCD 30mA
1
2
3
4
5
6
4
5
6
CL
DA
V+
S
V-
V+
S
V-
Temp.
12C
PWL
PWH
13
13
4
4
4
4
4
6
6
PE
PE
L
L
L
L
L
N N N N N
VA1
VA2 VA3 VW1
VW2
230 V~ 50 Hz
7
5
8
9
3
2
10
4
11
1
6
6
6
1
4
1
2
4A/T
N
LIGHT
2
L
PE
N
5
1 - connection clamps
2 - steering
3 - heater
4 connecting socket - temperature fuse
5 - PI 65 connection box
L
(to install by the construction team)
N
PE
Connection box IP65
related
related cable
3x1,5 mm², 2,0m
12
1
2
3
4
5
6
7
8
9
10
11
12
13

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Reviva ii ef03

Table des Matières