Télécharger Imprimer la page

Pfannenberg PWT 6402 230V Manuel D'utilisation page 45

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 62
GB
3.4.5
Switch cabinet assembly
Figure 10 – Assembly of air/water heat exchangers with sash fasteners
Procedure
Slowly and evenly lift properly secured unit.
Assemble the air/water heat exchanger horizontally.
Permissible inclination up to 0.5° from the horizontal plane (switch cabinet + cooling unit)
 The switch cabinet should be precisely aligned.
Place the air/water heat exchanger on the roof of the switch cabinet and align it with the cut-out/seal.
Lay the condensate drain hose continuously with a gradient and without any kinks.
 The condensate drain hose must not exceed 3 m in length.
 Regularly check during operation as to whether the condensation drains off properly.
Position the air/water heat exchanger precisely in the cut-out.
Attach all sash fasteners (1) of the accessory kit to the bottom of the air/water heat exchanger, see figure
(10) Assembly of air/water heat exchangers - Detail cut-out A.
Turn all sash fasteners (1) over the roof cut-out edge and thus firmly mount the air/water heat exchanger,
see figure (10) Assembly of air/water heat exchangers - Detail cut-out B.
In case of deeper switch cabinets (over 600mm in depth), the sealing areas of the switch cabinet roof must
be reinforced (reinforcing angle / system angle from switch cabinet manufacturers).
The unit is mounted on the switch cabinet and ready for electrical connection, see .
Operating Manual PWT 6402 230V / 400V 086100107b © Pfannenberg GmbH
Page 15 / 30

Publicité

loading

Ce manuel est également adapté pour:

Pwt 6402 400v