Thermador PH Serie Instructions D'installation page 9

Masquer les pouces Voir aussi pour PH Serie:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installing an Integral Blower VTN1000Q
The hood can be installed with a VTN1000Q
blower.
Blower preparation
Wire tie
Capacitor
Blower Front View
Figure 12a
1. Remove left and right shipping brackets
and discard.
2. Cut wire tie shown in Figure 12a. Locate the
wire harness with the Molex 6-pin connector.
Route wire harness out rear of blower, as shown
in figure 12 b. below.
3. Re-attach wire harnesses to capacitor with new
wire tie (supplied) in same location in front.
Blower Rear View
Figure 12b
4. Attach wire harness with Molex 6-pin connector
to housing as shown in Figure 12b with wire tie
(supplied).
Shipping brackets
Add wire tie
here
Wire
Harness
Page 9
Install blower in hood:
1. The blower is attached to the hood using weld
studs provided on the mounting plate.
2. Figure 12c shows the weld studs in location B
for horizontal (rear) discharge. Attach four #10-
24 nuts to the weld studs. For vertical
discharge, attach nuts to studs at the top of the
mounting plate.
Figure 12c
3. Guide the motor mounting plate over the nuts
and tighten to secure the blower to the hood.
4. Attach two additional screws as shown in
Figure 12d.
Figure 12d
CAUTION:
Verify that the two additional screws in
Figure 12d are installed and properly
tightened before continuing.

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Phh30zsPh36zsPh42zsPh48zsPh54zs

Table des Matières