ATOMSTACK A5 Mode D'emploi page 10

Masquer les pouces Voir aussi pour A5:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

4
3
3
2
S t e p 3
3
1
Synchronous belt *2
Profile end cover *4
Step3 Requiredcomponents:
3
Installation Manual:
5
1. Install two synchronous belts as shown in the figure. First
Tighten the T
tighten one end with a T-nut, then pass the other end
nut and cut off
through the roller on the X-axis assembly as shown in the
the excess belt.
figure, and finally tighten the other end and fix it with a T-
nut.
2. T-nut fixing method (Push the T-nut from the groove on
the end of the profile, and then use the screw to tighten the
T-nut), the T-nut is as close to the end of the profile as
possible, and cut off the excess belt.
3. Cover the profile end cover (the side of the end cap with
protrusions is facing down)
TIPS:
The installation of the Y-axis synchronous belt can refer to
the installed synchronous belt on the X-axis
assembly.Determine whether the timing belt is tight enough:
press the position shown in Figure 4 with your fingers, and if
there is no obvious deformation, it is tight enough. If the
deformation is large, loosen one end of the T-nut and
tighten the timing belt, and then tighten the T-nut.
Type T Nut *4 Type T Nut Lock
screws*4

Publicité

Table des Matières
loading

Produits Connexes pour ATOMSTACK A5

Table des Matières