Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

1. Install stand
make sure the indent (A) of the rod is in line with threaded pin (B). Install
stand in hole (C) in the rear of the item. Secure (pull tight) threaded pin (B)
using Allen key (D).
E
F
Now introduce stirrer attaching rod (K) into clamp (I).
Adjust position and secure (pull tight) with two clamp screws (L).
5. Install flexible coupling shaft (P/N 509-03000-00)
Hold the flexible coupling shaft (O) in the chuck (G) by its metallic stud (P)
and secure with T-handle. At this point introduce stirring tool's (N) shaft end
When using the flexible coupling shaft make
sure to install an adequate run-out protection,
e.g. our enclosure (P/N 509-09000-00)
S
S
R
H
G
2. Install chuck
make sure the indent (E) in the drive shaft is in line with threaded pin (F)
in the chuck. Secure threaded pin (F) with Allen key (H) in your hard-
ware bag.
3. Install stirrer on stand
Install clamp (I) on stand (J).
M
G
N
4. Install stirring tool
Introduce stirring tool (N) in chuck (G), put in place and secure with T-
handle (M). Immersion depth of your stirring tool (N) is adjusted by dis-
placing the tool in and out in the open (G) chuck (except RZR 2102 con-
trol Z)
Refer to arrow mark.
in collet (Q) and pull tight (CW turn).
6. Install shaft guard (P/N 509-08000-00)
A shaft guard (R) is available as an extra safety protection feature.
This guard tube is held by 2 ea. screws (S) located at the top of the
stirrer chuck.
This guard, attached to the stirrer housing, is used to protect the
user from being hurt by the fast-spinning shaft.

SET-UP

19
B
L
K
J
E
D
C
A
I
L
G
P
O
Q
N

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Rzr 2052 controlRzr 2102 controlRzr 2102 control z

Table des Matières