Installation Check-Up; Hot Water - Cimbali E98 Utilisation Et Installation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 45

5. Installation Check-up

WARNING: AFTER INSTALLATION, CHECK TO SEE IF THE MACHINE IS WORKING PROPERLY
(see the Installation Module C)
WATER CONNECTIONS
No leaks from the connections or tubes
FUNCTIONING
Boiler and operating pressures are normal.
The pressure gauge is working properly.
The self-levelling device is working properly.
The expansion valves are working properly
WARNING: ONCE THE MACHINE HAS BEEN INSTALLED AND IS READY FOR USE, BEFORE
ALLOWING THE WORKER TO START USING THE MACHINE, WASH THE INTERNAL COMPONENTS
ACCORDING TO THE INSTRUCTIONS BELOW:
GROUPS
Let each group dispense water for about a minute.

HOT WATER

Continuously dispense hot water (pressing the appropriate button) until at least 6 liters of water have been used
for a machine with 2 groups and 9 liters for a machine with 3 groups (see the "Hot water dispensing" chapter in the
User's Manual).
STEAM
Dispense steam from the nozzles for about a minute, using the appropriate buttons.
.
6 EN

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

M23950-117-0101844

Table des Matières