Installation; Mounting The Range Hood - WindCrest WST300SBG Guide D'utilisation, D'entretien Et D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION

Mounting the Range Hood

8"-7/8
D
5"-11/40
1. Measure from range top to hood bottom (28" min).
Level and mark line A.
2. Plum and mark center line.
3. Mark mounting height line B (17"-1/4 from line A)
and line D (15" from line B).
4. Mark mounting spread from C/L 8"-7/8 up line B,
and 5"-11/40 up line D.
5. Find studs behind drywall by tapping wall or using a
stud finder. Mark the center of the studs with a vertical
line to the right and left of the marked fastener
location.
6. Note: All fastener location must span the studs
otherwise proceed as follows:
Cutout drywall along marked lines. Install wood
blocking between studs and make sure it is flush
with existing stud front. Make sure all mounting
screws will anchor to added studs. Replace drywall
and refinish.
17"-1/4
15"
10
7. Determine and make all necessary cuts in the wall for
the vent system. Install the vent system before the
canopy hood. See „Venting methods" and „Dimensions
and clearance" paragraphs.
Note - for Ductless - recirculating - installations: Vent
system is not required.
3/4" Elec. K.O.
10"
1"-1/4
8. WARNING:
All Electrical work must be performed by qualified
electrician or person with similar technical know how
and background.
For personal safety, remove house fuse or open circuit
breaker before beginning installation. Do not use
extension cord or adapter plug with tihs appliance.
Follow National electrical codes or prevailing local
codes and ordinances.
9"-5/8
2"-1/4
6"
6"-1/2
14"-3/8

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Wst360sbg

Table des Matières