Valor Portrait President ZC Cast Front 536CXB Manuel D'installation page 7

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

b)
Fit the rear base support under the rear of the
appliance attaching it to the appliance back
panel with 2 x ⅜" thread cutting (pointed end)
screws.
c)
Fit the front plinth under the appliance front
with 2 thread forming screws.
Pull forward to expose
width of 4"
4.
Install the top insulation layer. For top vent
outlet appliances, cut out a circle at the center
of the insulation layer for the vent collar. Place
the insulation layer on top of the appliance case
inboard of the stand-off spacers.
 WARNING
Failure to install the insulation layer
Failure to install the insulation layer
may result in a fire hazard and void the
may result in a fire hazard and void the
warranty.
warranty.
4"
(102 mm)
total
insulation
Cut out insulation
for top vent installation
5.
If the hooks have been shipped loose with the cast
front, fix them to the front at its top corners. Hang
the front on the appliance.
7

Publicité

Table des Matières
loading

Table des Matières