Installation Preparation; Tools Needed For Installation; General Preparation - Haier HHX6030 Guide De L'utilisateur

Hotte de cuisiniere
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

English

Installation Preparation

To install this range hood, you will need the following tools and materials:
Note: This procedure will require 2 people for easier installation.

Tools Needed for Installation

• Drill
• 1/8" Drill bit for drilling pilot holes
• 1-1/4" Wood bit for drilling electrical wiring access hole
• 3/8" Nut Driver or Ratchet with Extension
• Phillips head screwdriver
• Flat-head screwdriver
• Pliers
• Pencil, rule and level for marking range hood location
• Hand saw or jig saw for cutting the wall or cabinet openings
• Duct tape
• Electrical tape
• Connector Clamp

General Preparation

Caution! Please be sure to turn the electrical power switch OFF before beginning
the installation.
1. Remove the range hood from the carton.
2. Lay the range hood upside down on a table covered with either cardboard or
paper to prevent scratching the hood or table.
3. Remove the 3 grease filters from the hood. Place them somewhere safe so they
will not be damaged.
4. Install two 40 Watt light bulbs.
5. Remove the range hood's blower. Use a 3/8" nut driver or ratchet to remove
the 4 nuts holding it in position (Fig. 1). Place the blower and nuts somewhere
safe until needed. The wires to the blower are inside a housing. The top of the
housing must be removed first to get to the blower wires.
6. Turn the hood right side up so you can see
the duct knockouts and
mounting holes.
5
All manuals and user guides at all-guides.com
fig. 1

Publicité

Table des Matières
loading

Table des Matières