General Operation - weasy TRC50 Manuel D'utilisation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 23

GENERAL OPERATION

Preparation for Operation:
Attention: Make sure the filter is installed correctly.
1. Install the side brushes and install the battery according to the manual.
2. Turn off the power switch on the side of the unit, and charge the battery for 5 hours
prior to the first operation.
3. To ensure the best efficiency of the unit, first is to remove clothes, paper, cable,
extension cable scattered on the floor, roll up the curtains and drapes if any to avert
the possible accident. In case of the cable entangled with the cleaner, the cable could
move around as the cleaner is working and might topple down the table, chairs, even
cabinet or cupboard.
Control Panel:
D. C. jack
Power indication lamp
Power indication lamp
Color of the lamp
Green
Green flashing
30 minutes working time
indication lamp
Red
Max working time
indication lamp
Indication
Power on with sufficient battery power
Unit is in charging mode
Battery low, charging required / Wheel
Table 1
Dust bin full
indication
stuck

Publicité

Table des Matières
loading

Produits Connexes pour weasy TRC50

Table des Matières