Tools And Materials; Before You Begin - Kohler STERLING 442007 Garantie Et Guide D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Thank You For Choosing Sterling
We appreciate your commitment to Sterling value. Please take a few
minutes to review this manual before you start installation. If you
encounter any installation or performance problems, please don't
hesitate to contact us. Our phone numbers are listed within this
manual. Thanks again for choosing Sterling.

Tools and Materials

Template
Pencil
(supplied)
Tape
Scissors
Measure

Before You Begin

Observe all local plumbing and building codes.
Prior to installation, unpack the new lavatory and inspect it for
damage. Return the lavatory to its protective carton until you are
ready to install it.
Inspect the drain and supply tubing. Replace if necessary.
Use the template supplied with the lavatory.
You must cut the hole in the countertop before installing the
countertop.
For replacement installations, make sure the existing cutout is the
same size or smaller than needed for the new lavatory.
Sterling reserves the right to make revisions in the design of
products without notice, as specified in the Price Book.
1086447-2-A
Sealant
Drill
Plus:
• 1/2" drill bit
• Rags or Paper Toweling
Jigsaw
2
Safety
Glasses
Sterling

Publicité

Table des Matières
loading

Table des Matières