Salta Round 563 Instructions De Montage page 15

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

STEP 2 - Support Assembly
STEP 3-Top Rail Assembly
A. Slide all Vertical Leg Extensions (6)
onto the Leg Base(5) as shown
6
5
A. Two people will be necessary at this point to
assemble the trampoline. One person lifts the
3
Support Assembly from step 2 to a standing (verti-
cal) position and inserts one of the sockets of the
Top Rail with Sockets (3) into the Vertical Leg
Extension portion of the Support Assembly. The
other person holds the other end and inserts that
portion into the other Support Assembly as
shown. You should now have 2 Support Assem-
blies held together by 1 Top Rail with Socket
B. Now, install the other 4 Top Rails (4) into the gaps
4
between the Vertical Leg Extensions (3) by insert-
ing them into the slots as shown.
GB
12

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Round 565Round 561Round 564Round 566Round 562

Table des Matières