Télécharger Imprimer la page

Reese Dual Cam HP Instructions D'installation page 2

Stabilisateur haute performance

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION
1. Locate both hanger brackets included in the kit (item 2, figure 1). Install U-bolt and chain from your Weight Distribution Kit
on each hanger bracket as shown in figure 3 (if installing Dual Cam HP on an existing weight distribution kit, the U-bolts and
chains will need to be removed from each spring bar before they can be installed on the hanger brackets).
The U-bolts must be installed in the ends of the chains (last link) as shown in figure 3.
2. Install 2 lock nuts per U-bolt, tighten u-bolt nuts. Make sure at least 2 threads are showing past the ends of the nuts.
3. Using a grease pencil or suitable marking device such as a marker and a straight edge locate and mark the center of the hitch
ball on the coupler both horizontally and vertically as shown in figure 4 . This reference point will be used to locate the cam
arm assembly position.
4. If the adjustment is difficult, as the adjustment nut must be turned by hand, apply a small amount of light penetrating oil such
as WD40 or PB Blast to the threads of the cam arm. Work the adjustment nut back or forward to get the penetrating oil into the
threads until the adjustment nut moves freely to the desired position.
ADJUSTMENT NUT
LOCK WASHER
LOCK NUT
©
2014 , 2017 HORIZON GLOBAL
Installation Instructions
REESE Dual Cam HP
High-Performance Sway Control
Figure 5
Sheet 2 of 33
Figure 3
Mark both sides of the coupler.
Figure 4
YOKE
26002IN
5/31/17
Rev. T

Publicité

loading

Ce manuel est également adapté pour:

26002