EN
OEM Manual – CUBO
AQUA
2
All connection must be done by qualified persons according to legal standards in force in the
relevant countries and to EN-60204-1. Supply cable must be connected on terminal of upstream
main switch. Connect wire of ground (PE), from specific terminal block to system protection.
Pag. 40-EN
UMT/WG T MT Rev3.0 – 08/10/2021