Electrical Wiring - Riello 40 FS15D Manuel D'entretien

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

3.4 ELECTRICAL WIRING

Ionization probe
Electrode
Ignition transformer
Air pressure
switch
Capacitor
CARRIED-OUT
IN THE FACTORY
TO BE DONE BY
THE INSTALLER
PG – Minimum gas pressure switch
S3 – Remote lock-out signal
(230V - 0.5 A max.)
T6A – Fuse
TL – Limit thermostat
TS – Safety thermostat
TR – 2 nd stage thermostat
V10 – Safety valve
V11 – 1 st stage valve
V12 – 2 nd stage valve
ATTENTION
In the case of phase-phase feed, a
bridge must be fitted on the control
box terminal board between terminal
6 and the earth terminal.
Do not swap neutral and phase over, follow the diagram shown care-
fully and carry out a good earth connection.
The section of the conductors must be at least 1mm². (Unless requested
otherwise by local standards and legislation).
The electrical wiring carried out by the installer must be in compliance
with the rules in force in the country.
Verify that the burner stops by operating the boiler control thermostats
and that the burner locks out by separating the red ionisation probe
lead connector.
NOTES
The burners have been type-approved for intermittent operation. This means
they must stop at least once every 24 hours in order to allow the electrical
control box to check its efficiency on start-up. The boiler limit thermostat (TL)
normally ensures the burner halts. If this does not happen a time switch halt-
ing the burner at least once every 24 hours must be applied in series to limit
thermostat (TL).
2748
Connector
Motor
Blue
White
Black
230V
Air damper actuator
Control box
RMG 88.620A2
~
50Hz
5
GB
Terminal board
VERSION
FOR GAS LEAK CONTROL DEVICE
(DUNGS VPS 504)
Burner earth
D4346

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

590m3759003

Table des Matières