5- INSTALLATION OF THE REEFING LINE (like standard furler)
Y
6- ADJUSTING THE FURLING LINE GUIDE (LS RANGE)
Z
F a c n or - n o ti c e de m o n ta ge 2 9 1 6 0 0 4 0 0 3 0 r e v 2 0 1 9 - e n r o u l e u r s de gé n oi s s ou s p on t I D -L S
5.1 Positioning the front deck block
The furling line should be installed as shown.
The furling line should run off at 90° to the forestay and
X
through the stainless steel guide (fig. X). (If the line does
not run within the guide, please see paragraph 6.1 below) .
Fit the front deck as far as possible from the drum. The
furling line should run at 90° to the foil sections with the
line situated at mid-height round the drum as shown.
5.2 Setting the reefing line up
IMPORTANT: First half hitch the furling line (fig. Y)
around the body of the drum. Then, feed the line
through the hole in the top plate and tie a figure eight
knot as shown.
end with a half hitch.
When the sail is furled up, there should be always
a few turns remaining around the drum
6.1 Slightly loosen the two screws (fig. Z) so that the
guide can rotate.
6.2 Orientate the guide by pulling the furling line up.
Then tighten the two screws (fig. Z).