Anchoring; Inspection, Management & Maintenance; General; Standards - Euroscaffold 190 Manuel De Montage Et D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

PROFESSIONAL WORK TENTS

5.4 ANCHORING

ALWAYS anchor the rolling scaffold when using a work tent.
6. VERPLAATSEN
Never move a scaffold with a work tent mounted on top of it. Instead, deconstruct the work tent and scaffold and
reconstruct it in the new spot.
7.
INSPECTION, MANAGEMENT & MAINTENANCE
Make sure that the materials are all clean, particularly the pins. The frames must easily slide in and out
of one another.
Remove any dirt or paint from the threading on the adjustable spindles.
If any parts are not functioning properly, check them for dirt, paint, bits of concrete, warping, etc.
Never try to use hammers or other tools to get the parts to function properly.
Make sure that the rungs on the frames are all clean.
Make sure that the pawls on the diagonal and horizontal struts are clean.
Treat the materials gently; never let them hit a hard surface. This may impair the quality of the material.
Store the materials properly.
Never use damaged parts.
Replace missing or damaged parts in a timely fashion.
Make sure your scaffold is recertified by an accredited certification agency at least once a year.

8. GENERAL

8.1 STANDARDS

Euroscaffold work tents are covered by the standards for aluminium (rolling) scaffolds. The applicable standards
are:
NEN-EN 1004
NEN-EN 1298
Please make sure you are always up to date on the latest legislation and regulations regarding the use of clim-
bing gear and scaffolding. If you have any questions regarding our products and materials, the construction or
use thereof, please always feel free to contact us. We can also help you maintain, repair or replace your scaffold
and related gear.

8.2 DECLARATION OF CONFORMITY

We hereby declare that all materials provided have been inspected for any defects, damage and wear before
they were shipped to you. Any parts that do not meet the applicable standards are not delivered, but immediately
isolated through our quality assurance system. All inspections are carried out in accordance with the applicable
standards. All repairs are performed by qualified mechanics in full accordance with the manufacturer' s
guidelines.
P O W E R E D BY K N OW L E D G E
euroscaffold.com

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

250305

Table des Matières