2. Connecting the Pipe
The protection plug and the filler plug must be removed from the top and bottom connectors before beginning the pipe
connection.
The watering basin can be connected either from below or from above. The watering basin is also suitable for circulation
heater systems and can be connected from above and below simultaneously.
!
-> Seal all connections!
If the watering basin is only connected from one side the free connection must be sealed with a filler plug. (The filler
plug is included in the scope of delivery)
For pressures >3 bar we recommend installing a pressure regulator in the supply pipe in order to be able to regulate the
water pressure.
!
Please adhere to the connection diagram
3. The supply pipe to the watering basin must be frost-proofed
The supply pipe to the watering basin must be frost-proofed. Please use the relevant KERBL heating cable for this pur-
pose and insulate it in accordance with the guidelines.
!
The heating pipes, the insulation and the supply pipes to the watering basis must be protected from
browsing.
4. Electrical Connection for the Heating Element
The 24V power supply must be laid along the existing pipe to the H10 heatable watering basin.
!
The transformer and frost protection thermostat are not included in the scope of delivery and must be
ordered separately. Caution: the heating element has a power input of 100 W. A 200 W transformer must be
selected in order to also operate e.g. a 24V KERBL frost protection heating cable.
Note: The transformer and thus the devices connected to it can be switched on and off automatically using a
KERBL frost protection thermostat (#222794). This can save energy and thus cut costs.
The 24V power supply must be connected to the underside of the watering basin through the cable feed-through on the
terminal box. Please lay the cable in the terminal box in such a way that the terminal box cover can be screwed on. The
feed-through plug for the supply pipe needs to be punctured so that the supply cable can be fed into the terminal box.
!
The electrical connection may only be carried out by a qualified electrician. The relevant national regula-
tions and guidelines must be taken into account.
!
Please adhere to the connection diagram