Global Industrial WB988295 Directives D'assemblage page 3

Positionneur de palette à ressort
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

SPECIFICATIONS
Load capacity ...............................400 to 4500 lbs., depending on springs
Load size ......................................50" wide x 50" long x 72" high (max.)
Length ..........................................45-1/4"
Width (base frame) .......................36-3/4"
Compressed height ......................9-1/2"
Extended height ...........................27-3/4"
Rotating ring, outside diameter ....43-5/8"
Rotating ring, inside diameter ......40-5/8"
Net weight ....................................380 lbs., with (3) springs installed
INSTALLATION INSTRUCTIONS
UNPACKING THE UNIT
1. Before you start to install the unit, check
for local codes and ordinances which may
apply. It is your responsibility to obtain any
necessary permits.
2. Please read all of these instructions carefully.
Be sure to read and understand all of the
warnings.
3. Inspect the shipping pallet carefully for any
damage which may have affected the unit.
If you see signs of damage, tell the trucker.
Also make a note of this on the shipping
papers which you are asked to sign.
4. Choose the place where you want to use the
unit. It is very important that the unit be set
up on a smooth and flat surface. Check the
floor surface carefully and make sure that it
is free of all loose debris and dirt.
SETTING UP AND INSTALLING THE SPRINGS
1. The unit will always have at least one spring.
This spring has an orange mark, and is
larger in diameter than the others. This large
orange spring is always placed in the front of
the unit. Figure 3 shows the position of the
first spring. The frame of the unit can handle
loads of up to 4500 lbs. In order to adapt the
unit for different pallet loads, the springs are
changed. The springs are chosen to match
the weight and height of a fully loaded pallet.
A unit may have one to three springs. Each
time the pallet weight or pallet height is
changed, the springs may also need to be
changed. Table 1 shows how the springs
are selected.
2. The unit is shipped without springs installed.
The installation of the first spring (orange)
requires two people. Lift off rotating ring and
both yellow bayonets. Set them aside, they
will be installed later.
Fig. 4
Spring-Actuated Pallet Carousel Skid Positioner
CAUTION!
The unit must be installed on a smooth flat
surface. If the floor is not flat, this can create
stresses in the frame of the unit. The unit
may not work properly, or parts of the
unit may wear more quickly than they
should. You may be hurt or the load may
be damaged.
5. Position the unit beside the point where
the unit will be set up.
6. Remove the banding which secures the
unit to the pallet. Remove all packing
material. Shift the unit to the floor. Support
the base as you do this.
7. Check to see that the frame of the unit is
sitting firmly on the floor. Try to move or
rock the frame of the unit. The base frame
Fig. 3
Back
(Hinged End)
3. The shock absorber is attached to the top
frame of the unit with a pivot pin, and this
is held in place by a linch pin. The pivot pin
is used to hold the table frame in the raised
position. Take a look at the mechanism and
note the positions of the parts. Remove the
linch pin and remove the pivot pin. Lay the free
end of the shock absorber down.
Fig. 5
8. Remove the springs and lay them out on
9. If you have any questions about the steps
4. With the help of an assistant, lift the top
Fig. 6
3
Assembly Instructions
should be stable, and should not move.
Check to see that the base frame is level.
the floor.
in the installation process, please call
Global Industrial Customer Service.
Front
(Roller End)
frame until it hits the upper latch stops.