6556083.book Seite 18 Dienstag, 22. November 2016 11:30 11
4 Preparation
18
4.3
Before each patient
1. Purge the water and air channels for 30 seconds.
Preparation _ Turbine
2. Attach the turbine.
3. Insert the bur instrument.
4. Set a sufficient amount of cooling water (> 50 ml/min) [ → 20].
5. Use filtered water only (< 50 µm).
6. Check the nozzles for blockages and lime deposits, for example, and
clean the nozzles if necessary.
CAUTION! Insufficient cooling leads to overheating of the
Overheating at the preparation site
preparation site and damage to the tooth substance. Ensure that the
water content is > 50ml/min.
Operating Instructions BA ULTIMATE
65 56 083 D3560.201.10.03.02